Estimating

Estimating (QSB2314)

Puan Azrina Md Yaakob is the lecturer for this module and this is the 2nd time she is being our lecturer it is because she was our lecturer for Management Science subject in our last semester. In this module, we've learnt about the principle of estimating, project cost estimating, components of build-up rates, various method of estimating, and the works of sub-contracting. Not only that, we've learnt hoe to calculate the excavation work, concrete work, brickwork, roof construction and finishes, glazing, plastering and tiling, carpentry and joinery, painting works, and plumbing works. Now, i am able to identify, explain and distinguish the various terminology related to estimating, measurement and unit rates including the objectives and various components of estimating, measurement and unit rates at different stages of construction procurement. I am also able to estimate the unit rates by considering and evaluating other factors influencing the cost of the construction components and elements.

There are also 2 assignment for this module which both of the are group assignment. For the 1st group assignment, there are 2 task that's need to be done by us which the first task is that we are assigned to form a group of 4 to 5 students in a group to do a seminar of  certain question, as my group is the 4th group, so we are doing seminar for the question no. 4 as shown below:
For the second task, we are to estimate the total cost and the unit rate of certain element of a building and tutor our friends during our tutorial class. The question for our group is: roofing tutorial
For the 2nd group assignment, we are required to form a group of 9-10 person in a group to obtain the tender documents as per the tender invitation. We acted as a contractor and we even have our own company name, our company name is "The RING SDN BHD" (THE RING) and we need to prepare a set of tender document and submit to our lecturer as she is our client to see whether which group win the tender. Our group won the tender because our tender is the 2nd lowest compare to the other group.  (Click this link for furthur information of the assignment -->Assignment 2)

Me and my group members (The RING SDN BHD).

No comments:

Post a Comment