Site Surveying

Site surveying

Mr. Wong Jee Khai is the lecturer for us in this subject. He is a funny guy that makes our lecture to have more fun so that we can have better understanding of this subject and kills our sleepiness during his lecture. Without his sense of humour, this subject will bored us till die and we will end up with learning nothing because this subject is full of theories and something that we never learned or heard before in our life.

This subject is new for as this is not a pre-requisite subject, so I din't took this subject in my last semester. Actually this subject is quiet interesting and can let us prepare ourself before we get into our job as this subject explains the fundamentals of site surveying, linear survey, levelling, traversing, satellite positioning, remote sensing, mapping survey and building construction surveying which will help us in our future life. This subject will let us handle our job easily in the future, because as a quantity surveyor, we are not only doing our job in an enclosed place but sometimes we also need to go to the construction site and do some survey on it, so this subject brought a lot of advantages for us.

The requirement of this group assignments for this subject is we have to form a group that consists of 5 members in a group and make discussion about the fieldworks that we have done. There are two fieldwork for this subject, which are levelling and traversing. We are assigned two assignments for this subject because we do not have final exam for this subject, so our lecture decided to give us a mid-term test and two fieldworks in order to fulfil the requirement of the exam rules. During this two fieldwork, we have the opportunity to work with some equipments that are required for our fieldworks. In this case, we are not only able to gain some fieldwork knowledge but we also are able to gain some fieldwork experience that will help us in our future life. So, this fieldworks are killing two birds with one stone for us.



Picture above shows a tripod that used during our both levelling and traversing fieldworks.

Picture above shows a auto level meter that used during our both levelling and traversing fieldworks.

Picture above shows the measuring staff that used during our levelling fieldwork.

Picture above shows a measuring tape that used during our traversing fieldwork.

Picture above shows the ranging rod that used during our traversing fieldwork.

Construction Technology 1


Construction Technology 1

Unfortunately, I am repeating this subject in my semester instead of taking construction technology 2 because I failed my construction technology 1 in my previous semester, and this is a prerequisite subject so I have to pass construction technology 1 then only I can take construction technology 2. But repeating this subject doesn't mean a bad thing for me because I can learn more and able to have a clearer picture in my mind. Mr. Leong Boon Tik is the lecturer for this subject and he is a dedicated lecturer who willing to help us to solve our problems all the times. Through this subject, I have gained a lot of new knowledge and have been told a lot of interesting facts that different from my lecturer. After I have learned something in my previous construction technology, that's mean I have some basic about this subject, so this time it is quiet easy for me to handle it. 

The topic that Mr. Leong has covered include site and temporary works, foundations, concrete framed buildings, roofs, walls, doors and staircases. Upon successful of this subject, I am able to explain the construction of buildings and the scientific principles which underpin the design and construction; explain the principles and practices of construction technology in residential buildings and to work generally of a more complex nature; describe the definition of appropriate functional requirements; appraise implementation of erection. 

Same like the other subject, we also asked to form a group of 5 members in a group in order to complete the group assignment. In our group assignment, we are required to do some research about the type of foundation, type of slab and type of roof of place that we are lived in. For our group assignment, we have done some research about a terrace houses that are under construction, and we have completed our group assignment with a lot of teamwork. For this subject, we also required to go for a site visit where located in Cyberjaya and write a site report after visit the site. The purpose of the site visit is to let us see the actual elements which we can't see during our lecture class and to gain some extra knowledge and experience for us to prepare ourselves before we enter our job.



Picture above shows the pad footing foundation that has captured during our site visit.

Picture above shows some reinforcement bars that has captured during our site visit.

Picture above shows 2 temporary toilets that has captured during our site visit.

Picture above shows a worker was preparing to bend the reinforcement bar with the bar bending machine.
Picture above shows another pad footing foundation that found at the other side during our site visit.

Picture above shows the information board about the construction site that has captured during our site visit.
Picture above shows the emergency escape plan that has captured during our site visit.


Measurement 2

Measurement 2

Miss Habizah Sheikh Ilmi is the lecturer of this subject for us in our semester 2. Basically, this subject is for us to learn the principles, purpose and function of Standard Method of Measurement (SMM2) including measurement principles, descriptions and standard phraseology. The topics that our lecturer has covered are the measurement of brickwork of 
internal and external walls, timber floors and stud partitions, staircase structure and staircase balustradings; floor, wall, ceiling and staircase finishes including painting.

During her lecture, she has taught us how to take-off quantities from drawings, how to produce measurement, and how to competently carry out the preparation of the Bills of Quantities for brickworks, stud partitions,staircase structure, staircase finishes and balustrading, floor, wall and ceiling finishes and precast concrete piling. Also, she always remind us don't be surprise that measurement 2 is more difficult than measurement 1, and the description for the elements in measurement 2 is way longer than the description for elements in measurement 1. In order to take measurement 3 next semester, I should work more harder, so that I can pass my measurement 2 and continue my degree with measurement 3.

For the group assignment of this subject, we are asked to form a group of 5 members in a group. For my group, we need to produce measurement for internal and external walls, internal and external walls finishes, internal and external floor finishes, and internal and external ceiling finishes of the corner lot of a terrace house. I am measuring the external wall finishes and the ceiling finishes in this group assignment. From this group assignment, I am not only gained a lot of knowledge but I also realised the importance of teamwork, I can't finish the group assignment without my group member.


Picture above shows the ground and first floor reflected ceiling plan of the terrace house for our group assignment.

Picture above shows the ground floor and first floor plan of the terrace house for our group assignment.

Picture above shows the garden, street, and side elevation of the terrace house for our group assignment.

Building Services 1

Building Services 1

Building service considered a new subject for me in my semester 2, and I must pass this subject to continue Building services 2 in my next semester. Miss Mariatul Liza Bt Meor Gheda. This subject is about services that are usually provided in a building, which are ventilation system, telecommunication services, storm water management cold and hot water supply, and sewerage disposal and treatment. We also have Illustrate services construction in schematic diagrams during our lecture so that we can have more clearer picture in our mind how the services work in a building. Before this, I have no idea how the installation process of those services work, but now I finally have some ideas how the installation process work in a building. By now, I am able to distinguish and differentiate the installation of various types of services in a building.

During the week that we were learning storm water management this topic, our lecturer, Miss Mariatul Liza has brought us to visit the SMART tunnel in Malaysia so that we can have better understanding about the management process of storm water in our country. Basically, SMART stands for  Stormwater Management and Road Tunnel. It is to solve the problem of flash floods in Kuala Lumpur and also to reduce traffic jams along Jalan Sungai Besi and Loke Yew flyover at Pudu during rush hour. The SMART is the  first dual-purpose tunnel in the world, so we should appreciate it and be proud of our our country. 

For the assignment of this subject, we are asked to form a group of five members in a group in order to complete our group assignment. The topic of my group assignment is " The integration of communications networks in the intelligent building". For this group assignment, we need to prepare a multimedia presentation so that the other groups which were doing another topic can have the opportunity to have the knowledge of the topic that our group has covered.





Picture above shows the SMART model.
Picture above shows the SMART model.

Picture above shows the control room of SMART.

Picture above was taken during my SMART tunnel visit.